Monday, 30 December 2013

Dry Build nearly completed

I had a bit of a push on the Husky over the Christmas holidays, after we got our electricity back on after the storms of course!


Steering damper assembly fitted, float bowl hanger made and the chain guard that had been cut off was remanufactured and fitted. 


The "proper" engine had been vapour blasted and reconditioned and will replace the unrestored dummy engine currently fitted.

Next job is to strip it all down, replace the metal bright work, rebuild the front wheel, have the seat upholstered and have the paintwork done.... The paint will be done by Cycle Sprays in Cranleigh, Surrey, who have done great jobs on the past few bikes I've restored.

No comments:

Post a Comment